Sydney Trains M set

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Millennium Train
250px
Millennium set at Sydney Central
250px
Vestibule of a Millennium carriage looking towards gangway
In service 2002–present
Manufacturer EDi Rail
Built at Cardiff Workshops
Constructed 2002–2005
Entered service 2002-
Number built 140
Number in service 140
Formation 4 car sets
Fleet numbers D1001-D1073, N1501-N1573
Capacity 104 in driver trailers, 122 in motor cars
Operator(s) Sydney Trains
Depot(s) Eveleigh
Specifications
Car length 20.532 m (67 ft 4 in)
Width 3.03 m (9 ft 11 in)
Height 4.381 m (14 ft 4 in)
Maximum speed 130 km/h (81 mph)
Weight 45.5 tonnes (44.8 long tons; 50.2 short tons)
Traction system 4 x 226 kW (303 hp) ALSTOM 3 phase induction motors per motor coach[citation needed]
Electric system(s) 1,500 V DC catenary
Current collection method pantograph
Braking system(s) automatic air, electropneumatic, regenerative, rheostatic[citation needed]
Track gauge 1,435 mm (4 ft 8 12 in) standard gauge

The Sydney Trains Millennium or M sets are a class of electric multiple unit operated by Sydney Trains in Sydney, New South Wales, Australia. The fourth generation trains entered service from 1 July 2002[1] after short delays due to electrical defects.[2] The trains can operate over the entire suburban network, but currently only operate on Sector 2.

The Millennium trains replaced the aging 1960s Tulloch trailers and provided extra capacity on the CityRail network.

Design

The Millennium train, like the Tangara, is a double decker. It is a four car consist, with the middle two cars being non-control motor cars and the two outer cars being driving control trailer cars fitted with the pantograph.[3] The Millennium train is equipped with an AC drive system, whereas the Tangara has a DC drive system. The sets usually operate in eight car formations with two four car sets combined.

While the Millennium train concept is an evolution of the Tangara concept (manufactured by A Goninan & Co), the Millennium train introduced new features such as internal electronic destination indicators, automated digital voice announcements (DVA) for upcoming stops, a return to reversible seating, surveillance cameras, wider stairways, a new safety yellow colour scheme, and push-button opened internal doors. The Millennium Train also introduced crumple zones to absorb impact in a collision. Carriage interiors were designed by Transport Design International [4]

Delivery

The cars were constructed by EDi Rail at Cardiff Workshops. The contract included a 15-year maintenance agreement with EDi Rail to maintain the trains at a specialised maintenance centre at Eveleigh. During testing and initial revenue service, they ran as four car sets, with eight car sets commencing service towards the end of 2002 after further testing. All 35 four car sets were delivered by October 2005.

The initial order signed in October 1998 was for 81 carriages, in December 2002 an option was taken up for an additional 60.[1]

Criticisms

The Millennium trains were criticised for having several technical problems and causing problems with the CityRail network; they were referred to in the media reports as The "Mi-lemon" and "Millenni-Bug" as a result. Some of the problems were caused by insufficient power supply on the overhead to cope with the power demands of the more technologically advanced trains causing them to shut down. Software bugs also contributed to the trains' poor reliability.

The Millennium trains were withdrawn from service in April 2003 while the problems were being rectified and a full audit was carried out.[1] They were subsequently reintroduced into service in June 2003 and have since been operating on Sector 2.

In service

External Carriage Camera Trial

File:M set external camera trial cityrail.jpg
Trial camera on train (Circled)

In late 2008 some trains were fitted with external cameras atop of carriages near the doors, testing their use for the then-future Waratah trains. These cameras were subsequently incorporated into the final design of the Waratah train.[5]

Lines serviced

The Millennium trains typically operate on the following lines:

Gallery

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Millennium CityRail
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Platform Guards Irrelevant Ecotransit

Further reading

  • Lua error in package.lua at line 80: module 'strict' not found.

External links