South Acton (MBTA station)

From Infogalactic: the planetary knowledge core
Jump to: navigation, search

<templatestyles src="Module:Hatnote/styles.css"></templatestyles>

SOUTH ACTON
File:South Acton station from inbound platform, November 2015.JPG
The rebuilt station near completion in November 2015
Location 10 Central Street
Acton, MA, 01720
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Owned by MBTA (station)
Town of Acton (parking lot)
Line(s) Lua error in package.lua at line 80: module 'strict' not found.
Platforms 2 side platforms
Tracks 2
Construction
Parking 287 spaces:
170 resident sticker spaces
107 open spaces ($2.50 fee)
6 accessible spaces
Bicycle facilities 44 spaces
Disabled access Yes
Other information
Fare zone 6
History
Opened October 1, 1844
Rebuilt 1980s
December 19, 2015[1]
Traffic
Passengers (2013) 902 (weekday inbound average)[2]
Services
Preceding station   MBTA.svg MBTA   Following station
toward Fitchburg
Fitchburg Line

South Acton is a passenger rail station on the MBTA Commuter Rail Fitchburg Line, in Acton, Massachusetts off Route 27 near Route 2. It is the busiest station on the Fitchburg line, averaging 902 weekday passenger boardings and thus generating 15% of the line's traffic.[3][2] It serves as a park and ride station for Acton and other suburbs of Boston, with a 287-space parking lot owned by the town.

There has been a station on the Fitchburg mainline at the South Acton site since 1844; until 1939, it also served a branch line to Marlborough, Massachusetts. South Acton has had continuous Boston commuter service since its inception except for five months in 1965 during the transition from fully private railroad operations to state subsidy.

As part of a $277 million project upgrading the Fitchburg Line, South Acton station is being completely rebuilt with two handicapped-accessible high-level platforms connected with an overhead pedestrian bridge, as well as a drop-off lane off Maple Street.[4] The work began in 2012 and the new station opened on December 19, 2015.[5][1]

History

B&M era

File:South Acton station 1911.jpg
A Marlborough Branch train at South Acton in 1911

The Fitchburg Railroad began serving the town with a stop, located off of School Street east of Main Street, when it reached the town on October 1, 1844. The railroad completed the first station in 1845 and, when the new station was built in 1892, the old station was moved to Jones Farm and used as a fire station until 1927.[6] The new South Acton Station served the Boston & Maine Railroad until the company sold the building in the early 1970s after it exited the passenger transportation business. This station burned in 1984 and was torn down.[6]

South Acton served as a station stop for both the Fitchburg Branch and Marlborough Branch of the B&M. The Marlborough Branch split off from the Fitchburg Railroad west of the station. The station also maintained a two-stall round house, a freight house, and a turntable, located off the Marlborough Branch. Marlborough Branch passenger service ended in 1939, though freight service continued on the line until around 1970. The stub of the branch at South Acton was used as a siding to turn RDC trains until its abandonment in 1979.[7] The right-of-way has since been reused for the Assabet River Rail Trail on its southern section, which is planned to eventually continue to South Acton beginning in Fiscal Year 2015.[8]

MBTA era

File:South Acton MBTA Station, MA.jpg
1980s-built platform in 2011 before reconstruction

The Massachusetts Bay Transportation Authority was formed in August 1964 to subsidize suburban commuter rail service. On January 17, 1965, northside services were cut to the boundaries of the MBTA funding district. The Fitchburg Line was cut to West Concord until June 28, 1965 when it was reopened to Ayer, restoring service to Ayer.[9][10] After service to Ayer was discontinued on March 1, 1975, South Acton was the end of the line until service was restored as far as Gardner on January 13, 1980.[9] During that time, the line was known as the South Acton Line.

In the 1980s, the Town of Acton and the MBTA moved the station stopping point two tenths of a mile westward, off of Central Street west of Main Street, to provide expanded on-site parking. The original parking lot is now the "overflow" parking lot; portions of the former platform remain in the brush off the north side of the tracks.

Fitchburg Line upgrades

File:South Acton end of double track.JPG
Before the upgrade project, this switch just east of the station was the outer end of double track on the line until Ayer. (The branch on the right led to a siding for trains which terminated at South Acton).
File:South Acton station from Main Street, August 2015.JPG
Platforms fully constructed in August 2015, with pedestrian bridge work and track work continuing

Until 2011, the main double-track section of the Fitchburg Line ended a quarter mile east of the station, with a short second under the Main Street bridge to allow a trainset to sit while preparing for an inbound run. The 1980s-constructed station had a single low platform, which was not handicapped accessible, serving the single track. As part of the ongoing upgrades to the Fitchburg Line infrastructure, South Action station was rebuilt and opened 2015, as the second track was added to the Acton-Ayer section of the line. The new station has separate platforms for inbound and outbound service; both platforms are full-length high-level for accessible boarding. They are connected by a pedestrian bridge which includes ADA-required elevators.

A single-platform design was considered in 2009, but the imposing design and the need for large ramps were disliked by town residents. The two-platform design, accepted in 2010, eliminates the need for large ramps and allowed for Maple Street access.[11] The new design is largely based on community input.[4]

A small drop-off lane will be built on the south side of the tracks off Maple Street, next to the new inbound platform. However, daily parking capacity will not be immediately increased.[4] Additional service and parking at Littleton/Route 495, additional parking at Ayer, and the opening of Wachusett should help to mitigate the demand for parking at South Acton.[11]

On June 11, 2012, the MBTA opened bids for the $9.622 million construction project.[12] Construction preparation began in September 2012. During the periods where the 1980s-built station platform is closed, temporary platforms east of the station (at the former station site) and west of the station are used to board passengers.[4] These platforms were installed in October and November 2012; ceremonial groundbreaking was held in December.[13][14]

The station site was prepared during the winter of 2012-2013, and work on the high-level inbound platform began in April 2013.[15] Foundations for the inbound platform and the pedestrian bridge were laid in 2013. The subcontractor for the steel bridge structure was replaced due to compliance issues in 2013, delaying plans to have the project open by early 2015.[5] The inbound platform was constructed in mid-2014, followed by the outbound platform in November 2014.[16]

The new station was largely complete by the end of November 2015 and opened on December 19, 2015.[5][17][1]

Service

File:South Acton temporary platform with train.JPG
A train stopped at the temporary platform in late 2012

Until 2014, South Acton was the only station other than Porter and North Station served by all Fitchburg Line trains, for a total of about 16 daily round trips. About one-third of these trips formerly terminated at South Acton, while the others continued to Fitchburg.

After the Fitchburg Line improvements are complete, South Acton will no longer be the outbound end of double-tracking. All short turn trains were extended to Littleton/Route 495 (which was rebuilt in 2013) effective August 4, 2014.[18] However, as a high-ridership station, South Acton is still served by all trains.

Ridership

South Acton averaged 902 inbound weekday boardings in 2013, making it the most heavily used inbound station on the Fitchburg Line.[2] It is the sole train station in Acton, a town with over 20,000 residents. The station also serves commuters from Route 2, which is 1.6 miles (2.6 km) to the north. The western expressway portion of Route 2 terminates in Acton, making South Acton convenient for many riders.

Ridership is also high due to the high number of trains that serve the station. Some commuters will drive inbound to South Acton from areas further outbound on the line in order to have a larger selection of trains. However, with more trains running to Littleton/Route 495 station and increased parking planned there, more commuters may drive there instead due to its closer proximity to Route 2.

Parking

File:South Acton bike parking.JPG
Bicycle parking area

There are 300 parking spaces, including 6 handicapped-accessible spaces, at South Acton split between two lots. The main lot contains 282 spaces, which are split between 155 resident permit parking spaces and 107 daily 12-hour spaces. The secondary "overflow" lot is located two-tenths of a mile from the station on School Street and contains 15 resident permit parking spaces. Resident parking permits cost $50 annually (but have a lengthy waiting list due to demand), whereas the daily 12-hour spaces cost $2.50 a day.

Although service increased at Littleton/Route 495, a new garage at North Leominster, and the opening of Wachusett are expected to bleed off demand, insufficient parking at South Acton is considered a town concern. Although no firm plans were in place, town officials stated in January 2014 that they were considering adding parking spots to serve the station and the Assabet River Rail Trail.[19] In February 2015, the town reported that it was considering the purchase of a property to create an additional 100-space parking lot on the south side of the station.[20]

South Acton also has a bicycle parking area with 44 spots to accommodate commuters who do not wish to drive to the station. The bicycle parking area is currently relocated during construction.[15] The completion of the Assabet River Rail Trail will eventually allow bicycle commuting from Hudson and Maynard to the station.

Connecting service

Clock Tower Shuttle provides connecting service between the South Action station and the Clock Tower Place office park in downtown Maynard.[21] In 2010, the Town of Acton launched a shuttle service between West Acton and the station, named MinuteVan.[22][23]

References

  1. 1.0 1.1 1.2 Lua error in package.lua at line 80: module 'strict' not found.
  2. 2.0 2.1 2.2 Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. 4.0 4.1 4.2 4.3 Lua error in package.lua at line 80: module 'strict' not found.
  5. 5.0 5.1 5.2 Lua error in package.lua at line 80: module 'strict' not found.
  6. 6.0 6.1 Lua error in package.lua at line 80: module 'strict' not found.
  7. Lua error in package.lua at line 80: module 'strict' not found.
  8. Lua error in package.lua at line 80: module 'strict' not found.
  9. 9.0 9.1 Lua error in package.lua at line 80: module 'strict' not found.
  10. Lua error in package.lua at line 80: module 'strict' not found.
  11. 11.0 11.1 Lua error in package.lua at line 80: module 'strict' not found.
  12. Lua error in package.lua at line 80: module 'strict' not found.
  13. Lua error in package.lua at line 80: module 'strict' not found.
  14. Lua error in package.lua at line 80: module 'strict' not found.
  15. 15.0 15.1 Lua error in package.lua at line 80: module 'strict' not found.
  16. Lua error in package.lua at line 80: module 'strict' not found.
  17. Lua error in package.lua at line 80: module 'strict' not found.
  18. Lua error in package.lua at line 80: module 'strict' not found.
  19. Lua error in package.lua at line 80: module 'strict' not found.
  20. Lua error in package.lua at line 80: module 'strict' not found.
  21. Lua error in package.lua at line 80: module 'strict' not found.
  22. Lua error in package.lua at line 80: module 'strict' not found.
  23. Lua error in package.lua at line 80: module 'strict' not found.

External links