Herndon station

From Infogalactic: the planetary knowledge core
Jump to: navigation, search
Herndon
Location 12530 Sunrise Valley Dr, Herndon, VA
Coordinates Lua error in package.lua at line 80: module 'strict' not found.
Line(s) Silver Line Silver Line (planned)
Platforms 1 island platform
Tracks 2
Construction
Structure type Surface
Parking 1750
Other information
Station code N10
History
Opened 2018; 6 years ago (2018) (expected)[1]
Services
  From 2018  
Preceding station   WMATA Metro Logo.svg Washington Metro   Following station
toward Ashburn
Silver Line

Herndon (preliminary names Herndon–Monroe, Herndon–Reston West)[2][3] is a planned Washington Metro station in Fairfax County, Virginia on the Silver Line. The station would be in the median strip of VA-267 adjacent to the current Herndon-Monroe Park and Ride parking garage and bus station, which is on the south side of the highway. This location is in Reston, but has a Herndon postal address. In anticipation of a future mass transit route in the Dulles Access Road median, in 1999 Fairfax County constructed a $20 million park and ride facility which includes a Fairfax Connector station that serves most bus lines in the Herndon and Reston areas as well as buses carrying commuters to the West Falls Church or other Metro stations daily. The existing facility is served by direct westbound on ramps and eastbound off ramps to SR 267. The existing parking garage has 1,750 spaces. The garage has drawn criticism because of alleged construction flaws.[4] The garage will be expanded to 3,500 spaces for the Metro station.

The proposed Metro station is scheduled to begin operation in 2018.[1] In the meantime, the Town of Herndon has initiated transportation oriented development of the land on the north side of the station. In turn, the Town of Herndon, on November 10, 2009, designated commercial, industrial and multi-unit rental residential properties within the town boundaries for inclusion in a special tax district to fund construction of Phase II of the Silver Line.[5]

Station layout

P
Platform level
Westbound Silver Line Silver Line (under construction) toward Ashburn (phase 2) (Innovation Center)
Island platform, under construction
Eastbound Silver Line Silver Line (under construction) toward Largo Town Center (phase 2) (Reston Town Center)
M Mezzanine One-way faregates, ticket machines, station manager
G Street Level Exit/ Entrance

Station facilities

Planned facilities for this station include:[6]

  • 2 station entrances (both sides of SR 267)
  • Pedestrian bridge SR 267
  • Bus dropoff/pickup (south side only)
  • Kiss & Ride (existing)
  • Parking for 3,500 cars

External links

References

  1. 1.0 1.1 Dulles Metrorail - Herndon
  2. Lua error in package.lua at line 80: module 'strict' not found.
  3. Lua error in package.lua at line 80: module 'strict' not found.
  4. Lua error in package.lua at line 80: module 'strict' not found.
  5. Lua error in package.lua at line 80: module 'strict' not found.
  6. Lua error in package.lua at line 80: module 'strict' not found.


<templatestyles src="Asbox/styles.css"></templatestyles>

<templatestyles src="Asbox/styles.css"></templatestyles>